New Pear workstation for electrodes construction

pearfornotornio

In September 2015 it has arrived a new Pear workstation for strengthening the electrodes’ construction, as well as a new parallel lathe MCM for the tooling department and a new oven Emmegroup for stress relieved with a capacity of 1 m3 to perform internally distension also of large arrays.